JTS Energy

 

Trouble Shooting Trade Effluent

In order to determine an overview of the historic and more importantly the current operating regime, it will be necessary to do a loading survey over a two week period of operation to monitor the plant performance. The loading survey will include:

  1. Continuous flow monitoring of individual streams
  2. 24 hour composite samples for analysis. Seven in total
  3. Review of historic, current and future operating parameters
  4. The analysis will be carried out by a fully accredited NAMAS laboratory and will
    include the following determinants:

    COD/BOD, pH, Solids, Suspended Solids, Metals
    The analysis results will determine how we can treat and improve the Trade

      Effluent quality and if it can be re-cycled giving a cost effective payback

Address: PO Box 703, PR8 6JR
Tel: 0845 370 3003 | Fax: 0845 370 3013 | Mob: 07891 940 281
Email: sales@jtsenergy.com - info@jtsenergy.com

 
jts energy