Trouble Shooting Trade Effluent
In order to determine an overview of the historic and more importantly
the current operating regime, it will be necessary to do a loading survey
over a two week period of operation to monitor the plant performance. The
loading survey will include:
- Continuous flow monitoring of individual streams
- 24 hour composite samples for analysis. Seven in total
- Review of historic, current and future operating parameters
- The analysis will be carried out by a fully accredited NAMAS
laboratory and will
include the following
determinants:
COD/BOD, pH, Solids, Suspended Solids,
Metals The analysis results will determine how we can treat and
improve the Trade
Effluent quality and if it can
be re-cycled giving a cost effective
payback
Address: 12 Torcross Close, Marshside Southport PR9 9GB
Tel: 0845 370 3003 | Fax: 0845
370 3013 | Mob: 07891 940 281 Email:
mailto:%20sales@jtsenergy.com
- mailto:%20info@jtsenergy.com
|