Trouble Shooting Trade Effluent
In order to determine an overview of the historic and more importantly the current operating regime, it will be necessary to do a loading survey over a two week period of operation to monitor the plant performance. The loading survey will include:
- Continuous flow monitoring of individual streams
- 24 hour composite samples for analysis. Seven in total
- Review of historic, current and future operating parameters
- The analysis will be carried out by a fully accredited NAMAS laboratory and will
include the following determinants:
COD/BOD, pH, Solids, Suspended Solids, Metals
The analysis results will determine how we can treat and improve the Trade
Effluent quality and if it can be re-cycled giving a cost effective payback
Address: PO Box 703, PR8 6JR
Tel: 0845 370 3003 | Fax: 0845 370 3013 | Mob: 07891 940 281
Email: sales@jtsenergy.com - info@jtsenergy.com
|